Shadow Lake Dam Drilling Update
The drilling at Shadow Lake Dam is scheduled for Wednesday March 12 and in the week of March 3rd they will be on site to pre-mark the boring locations so the drilling subcontractor can contact DIGSAFE.
The drilling at Shadow Lake Dam is scheduled for Wednesday March 12 and in the week of March 3rd they will be on site to pre-mark the boring locations so the drilling subcontractor can contact DIGSAFE.
Memphremagog Watershed Association and Northwoods Stewardship Center Conservation crew will begin the excavation of the planned areas. Reilly Auger will be excavating – Mike Pray and crew will be supplying Grant required In-Kind Services to support Reilly. There will be two opportunities to help with digging and planting existing flowers at the Municipal Building (Town Clerk’s Office). It…
The Health Department noted a recent case of rabies in a raccoon in the town of Glover, Vermont. Since wild animals move and interact with each other, a rabid animal detection means there is circulation of the virus and a risk of rabies from wildlife in the greater town area. All residents are urged to…